SP/COMPUTE · The Record
The truth about modern data centers.
Most of what people fear about data centers describes machines from twenty years ago. Here is what the current generation actually does, category by category. Every claim below traces to operator filings, interconnection rules, or published engineering standards.
Water
All data centers drain millions of gallons of drinking water every day and waste it permanently.
Cooling architectures vary widely. Older evaporative towers do consume potable water. Modern hyperscale and AI facilities predominantly run closed-loop liquid systems, air-cooled chillers, or direct-to-chip loops that fill once and recirculate indefinitely, with zero continuous evaporative loss. Where water is used at all, many operators run reclaimed greywater rather than drinking supplies.
Energy
Data centers crash local grids and send household bills through the roof.
A campus can draw 50 to 500 MW, which is exactly why the rules are strict: industrial tariffs require operators to fund their own substations, transmission lines, and interconnection. Where power gets tight, the cause is a grid that stopped building generation and wires. A customer that pays for both is part of the cure.
Noise
They sound like jet engines, around the clock, for miles.
The loud parts are rooftop chillers and backup diesel generators. The generators run about twenty minutes a month in tests, or during a grid outage. With acoustic baffling, sound-attenuation louvers, and perimeter barriers, boundary noise stays below typical industrial and suburban zoning limits, often under 55 dBA at the property edge.
Heat
They blast extreme heat into neighborhoods and heat the local climate.
Server exhaust leaves at roughly 30 to 40°C, low-grade warmth that dissipates quickly into the atmosphere with zero chemical emissions. In dense European districts the same heat is now captured through exchangers and piped into district heating for homes, pools, and offices.
Jobs & economy
Ghost warehouses that take land and subsidies and employ nobody.
Operations run on 50 to 150 specialized technicians, engineers, and security staff per campus. Construction runs for years and employs thousands of trades. And the property and business taxes are the quiet part: they fund schools and municipal services for decades.
What happens to the towns that say yes.
Loudoun County · Virginia
More than two hundred data centers pay a computer-equipment tax that grew from $466 million in 2022 to about $795 million in 2026. The county cut its property tax rate ten years in a row while revenues rose. The data centers paid, so the citizens paid less.
Loudoun County adopted budgets, FY 2022–2026Santa Clara · California
The city runs its own municipal utility, and public power priced well below the regional monopoly drew several dozen data centers into a few square miles of Silicon Valley. Their electricity purchases and taxes anchor a city budget its neighbors envy.
City of Santa Clara · Silicon Valley PowerRichland Parish · Louisiana
Meta's $27 billion data center roughly doubled parish sales-tax receipts before it even opened. The school district began paying certified teachers bonuses of up to $50,000, more than a full year's median salary in the parish.
The Wall Street Journal, 2026 · parish recordsWho is building.
The most consequential countries on Earth, the ones with the smartest citizens and the deepest capital, are building data centers and AI factories as fast as they can pour the concrete.
United Stateshyperscaler capex approaching $725B in 2026
Chinathe world's second-largest fleet, tens of GW installed
Indiasingle campuses measured in the tens of billions
Japannational buildout led by its largest conglomerates
South Korea18.4 GW national plan by 2035
European UnionAI gigafactory tender open across the bloc
United Arab Emiratesnational AI program with allied-scale campuses
Kazakhstan$10B program on cheap national power
Brazilmulti-GW pipeline across two coastsThe full map, country by country: compute.world · The Compute Net Worth Index
Sources: operator filings · grid interconnection rules · published engineering standards · IEA · Uptime Institute
Cold air, closed loops, and full-price power purchases. The current generation is quieter, drier, and better behaved than its reputation.